...No not really, paralever attaches to tranny...figure days not hours. I 'swapped' frames on an LT,(that was weeks, on an off) and lubing the trans. input spline alone is measured in hours. It may not be as difficult since your steering/head isn't affected, but its a lot of wires, pipes, and engine accessories to switch over.
A good winter project i'd say...good luck!