:euro
Hello chaps!
This thread will serve as a way for me to keep track of my Projekt, itemize what I need to do, and will update when I’ve done it. Suffice to say - this thread may move slowly :)
Background;Purchased this 1986 K75s in Early 2013 at roughly 120,000k's for $2000NZD
Cooling fan was non-functioning at purchase, but apart from that was fairly tidy. No Service History was provided with the bike.
Fairing had obviously been fibreglass repaired at some point, but was done to a high standard, slight rust around the tank filler cap, rear shock past it's best, and needed a new rear tire, but apart from that, ran well, never failed me, and looked good doing it :)
Had a slight crash mid 2013 - posted about it here - only damage was broken handlebar and windshield.
Replaced handlebar with spare bar from my parts bike (1993 K75s with ~40,000ks)
End of 2013 noticed oil leak coming from the oil pressure switch, front shocks not leaking but now working very well either (in combination with the old rear shock proved to be a very 'wallowly' ride) Throttle hesitation and massive backfires on deceleration caused by throttle sync being out.
About April 2014 I went out to start it up and what have you, and noticed the brake light and headlamp were active, even though the kill switch was on and no key. I haven't looked into this yet but suspect water in there somewhere or a shorted connection...
It's been off the road since early 2014 awaiting this Projekt to commence.
To Do List (In no order);Full Oil / Filter Change
Fuel Pump Filter Change
New Sparkplugs
Cleaned Injectors
New Brake Pads F and R
New Oil Pressure Switch
Rebuilt rear Hagon, or K100 Shock I have
Fresh, thicker Front Fork Oil (perhaps progressive springs)
New Brake Fluid
Mototronic instrument rebuild
Rust / corrosion around tank filler investigated / repainted
New Battery 02/August/2014
Front Brake Lever not activating Brake Light
Repair to RHS tragkorb crack
Throttle Body Sync
New Front Tire
Very small crack / tear in seat.
Replace hand strap between rider and pillion on seat
New handlebar + grips (perhaps move to a C bar)
Air Filter change
Rear Spline Lube
New Windshield
Centre stand install (was removed by P.O)
Fairing 'hardened' (it's a bit loose ATM)
Newer / cleaner Exhaust installed, or Remus which I have also.
General clean and tidy (Rims / Engine Block, Painting, new BMW Emblems)Key;RED = To do
BLUE / Strikethrough = Completed
:yow
Phew, looks like a bigger list on 'paper' than it did in my head! haha
I'll take a photo this weekend of the current state of the Brick, and post status updates as I tick something off the list :)
Wish me luck!Cheers,
Thomas
-Edit @ 05/August/2014 - Current Status;
Front Right
Rear Left