I figured I'd post my list of tasks on my brick this winter. Looking for anything others think I should take care of while at it.
Steering/Suspension:
New Steering head bearings
Relube fluidblock damper with Dow-Corning High vacuum grease
Possibly add a small preload spacer on the front suspension
Potential new rear Shock (Leaning towards YSS)
Other:
New Swingarm Boot (Old one seems torn)
New Tires (BT-45's)
Fix two of the sockets for the cluster
Fix clock on cluster
Possibly Calibrate the speedo, albeit at the risk of riding at an actual 80mph, rather than indicated 80 mph.
Set up a better mount for my running lights
Oil/Water Pump Rebuild
Modifications
I am going to install a O2 sensor bung, and a custom gauge. Give me a better idea of its tune, as it is getting poor mileage (~35-38mpg). I will be doing a normal, narrowband type, for 13.5-15.5 :1 AFR. I may need to adjust the MAF sensor, or just install the Megasquirt system and be done with it.